HomeLatest NewsWATER PROJECT -KITENGELA PHASE I (NEAR KAG UNIVERSITY)

WATER PROJECT -KITENGELA PHASE I (NEAR KAG UNIVERSITY) Featured

ALL MEMBERS

MAZINGIRA WELFARE ASSOCIATION

 

WATER PROJECT -KITENGELA PHASE I (NEAR KAG UNIVERSITY)

This is to notify all members that the Association has successfully completed installing a fully equipped borehole in Phase I Kitengela plots. Willing members and neighbors are currently being connected to our water system.

Our charges and connection fees are comparable to none as indicated below;

  • Water Connection fee (meter inclusive) is kshs.20,000.00
  • Cost per unit is kshs.100.00

Upon registration and payment of applicable fee one will be connected to our water system within ten (10) working days provided all conditions indicated in the registration form are met.

All willing beneficiaries and customers living within the area are invited to apply to benefit from our water connection and supply.

Thanks you and welcome all.

 

BY: MANAGEMENT

MAZINGIRA WELFARE ASSOCIATION

Last modified on Monday, 19 September 2022 10:12
Rate this item
(0 votes)
Leave a comment

Make sure you enter all the required information, indicated by an asterisk (*). HTML code is not allowed.


Strict Standards: Only variables should be assigned by reference in /home/mazingir/public_html/templates/ot_corporatetree/html/com_k2/templates/blog/item.php on line 542